Send us a text

By providing your phone number, you consent to receive calls and transactional/informational text messages (SMS) from Dead Tree General Contracting, powered by Topline Pro, including calls and messages made using AI-powered technology. You can unsubscribe at any time by replying STOP. Message and data rates may apply. Message frequency varies.

By submitting this form, you agree to our Terms of Service & Privacy Policy.

Dead Tree General Contracting

Bathrooms made for real life.

A clear path from the room you have to the bathroom you want.

Standard Bathroom Program

Finished master bathroom with marble-look floor, long dark vanity with stone counter and large mirror REAL PROJECT / WEST FRANKFORT, IL

Choose your path

Half-Bath Refresh

$5,995

Full-Bath Remodel

$15,995

Custom Bathroom

Individually priced

Starting prices assume standard conditions and package-eligible scope. The final written proposal sets your scope and price.

01 / Find your fit

Choose your bathroom path

Whole-room paths, plus standalone tub and shower services below.

Illustrative rendering of a half bath with dark vanity, mirror and toilet01

Half-Bath Refresh

From $5,995

An existing toilet-and-vanity room without a bathing fixture. Approved new fixtures and a fresh finish; layout substantially unchanged.

Illustrative rendering of a full bath with tub, sliding glass door, toilet and vanity02

Full-Bath Remodel

From $15,995

One approved prefabricated tub or shower system, toilet, vanity and finishes. Like-for-like showers include glass. Tub glass and conversions have the add-ons shown below.

Illustrative rendering of a custom bathroom with tiled glass shower and long wood vanity03

Custom Bathroom

Individually priced

Custom tile, built-in details, layout changes and specialty construction. Designed and quoted for your room.

How to choose

The room configuration and construction scope determine the path. Final eligibility and price follow a site visit.

Illustrative renderings, not completed projects. Exact products, fit and scope are confirmed in the written proposal.

02 / The installed scope

A complete full bath

One compatible prefabricated bathing system, finished as a whole room.

FROM $15,995

For package-eligible scope

  1. 01
    PrepCareful demolition and disposal of normal existing finishes.
  2. 02
    BathingOne approved tub/shower or shower assembly. Like-for-like shower glass is included. Conversion glass follows the option below.
  3. 03
    FixturesNew toilet, vanity and sink, faucet, mirror and vanity light.
  4. 04
    Room finishApproved waterproof rigid-core floor and transitions; normal fixture connections, trim, drywall, paint, hardware and final completion.
Catalog-based full bath concept with tub, sliding glass door, dark vanity and wood-look floor CATALOG-BASED ROOM CONCEPT

The bathing choice

Standard tub + compatible sliding glass door: +$1,500 installed ($17,495 total).

Eligible tub-to-shower or shower-to-tub conversion

Without glass door: +$2,495 ($18,490 total).

With compatible glass door: +$3,495 ($19,490 total).

Both directions use these options. With-glass conversion pricing includes the compatible door.

These add-ons require approved systems and eligible site conditions. Tile showers, curbless construction, freestanding tubs and separate tub-plus-shower layouts receive a Custom Bathroom quote.

Illustrative rendering; exact products and compatibility are confirmed in your proposal.

Standalone / Tub + shower

Replace it. Or convert it.

Standalone replacement and conversion – labor and standard materials included.

Standard / Without glass

$5,495

Labor + materials included

Standard / With glass

$6,995

Labor + materials + compatible glass

Flat rates cover qualifying standard selections and ordinary conditions. Written proposal confirms scope.

01 / Tub + surround

Replace tub with tub

Remove the existing tub and surround; install an approved like-for-like prefabricated tub-and-surround system.

02 / Shower

Replace shower with shower

Remove the existing shower pan and walls; install an approved like-for-like prefabricated shower system.

03 / Tub to shower

Convert tub to shower

Remove the existing tub and surround; install an approved prefabricated shower system in the existing bathing area.

04 / Shower to tub

Convert shower to tub

Remove the existing shower; install an approved prefabricated tub-and-surround system in the existing bathing area.

Labor and standard materials included

Remove and dispose of the old bathing unit and surround. Supply and install one approved prefabricated bathing system, standard plumbing components and installation materials, with normal fixture connections. Supply and install compatible glass when selected.

Fit, conditions and exclusions

The existing bathing-area footprint stays in place; no fixture relocation or full-room remodel. Site verification confirms fit, selected products and normal plumbing adaptations. Concealed damage, extensive repairs, out-of-code work, custom tile or glass, curbless and other specialty work are quoted separately.

Qualifying standard selections

Includes approved standard catalog selections or approved substitutions for one bathing system. Higher-cost choices and extra work are reviewed in writing. See More choices beyond the catalog. No new toilet, vanity, flooring or whole-room finishes.

03 / Bathing systems

Choose the bathing system

Start with your current footprint; Dead Tree verifies the compatible assembly.

White prefabricated tub and surround system with built-in shelf

Bathtub configurations + glass option

  • Low-profile bathtub
    01  Low-profile tubKOHLER Entity low step-over reference.
  • Standard tub and surround
    02  Standard tubSTERLING Traverse tub and surround example.
  • Wide bathtub
    03  Wide tubKOHLER Entity wider-fit reference.

Shower configurations

Prefabricated alcove shower pan and walls

Alcove shower

Prefabricated pan and walls with compatible glass.

System fit verified on site.

Corner shower with curved glass enclosure

Corner shower

Two walls and a compatible exposed-side glass enclosure.

System fit verified on site.

Product photos are reference examples. Exact models, finishes, fit and availability are confirmed in the written proposal.

04 / Materials and details

Selections with a purpose

A focused catalog gives the room a cohesive finish without an endless shopping list.

Charcoal shaker vanity with white top and open lower shelf

Vanities

Size and style matched to the existing layout.

White comfort-height toilet

Toilets

Comfort height, bowl shape and cleaning preference.

Chrome two-handle bathroom faucet

Faucets + trim

Coordinated sink and bathing finishes.

Warm oak-look waterproof rigid-core vinyl plank flooring

Flooring

Waterproof rigid-core LVP / 22-mil benchmark

Three-light brushed nickel vanity light

Mirror + light

Scaled to vanity.

Bathroom exhaust fan

Hardware + fan

Bars coordinated; fan fit verified.

More choices beyond the catalog

The catalog is a budget baseline. See below for included substitutes, upgrades and customer-purchased options.

Selections / More choices

More choices beyond the catalog

A practical starting point for standard products, budgets and finishes.

Bring us the products you like

You can choose beyond the products shown here. Home Depot, Lowe’s, Menards and local suppliers are examples, not an exclusive list. Dead Tree reviews your selection and the work needed to install it.

  1. 01 / Included substitute

    Equal- or lower-cost choices

    Compatible products with an equal or lower retail price than the included item are included in the package when Dead Tree purchases them. Any change in associated installation labor or materials is reviewed and approved in writing.

  2. 02 / Contractor-purchased upgrade

    Dead Tree purchases the upgrade

    For a higher-cost choice, Dead Tree can purchase the approved product with a 35% markup on its regular, nondiscounted retail price. Your estimate or change order states the package adjustment before purchase.

  3. 03 / Customer-purchased upgrade

    You purchase the upgrade

    For a higher-cost choice, you may purchase the approved product and have it on site for installation. The package receives a credit based on the retail value of the included item being replaced. The exact credit and related labor/material adjustments are shown in your estimate or change order.

Agree on the details before ordering

Dead Tree verifies fit, availability, required components and installation needs. The product choice, purchase responsibility, any credit and all price adjustments must be approved in writing in the estimate or change order.

West Frankfort, IL  |  Two bathrooms

Custom-quoted work can be simpler or more extensive than a standard package

One home. Two different bathrooms. Each quoted for the actual work requested.

West Frankfort master bath with long angled vanity and marble-look floor
Master bath vanity and mirrors
Freestanding tub beneath window
Freestanding tub detail with floor-mount faucet

Master bath  |  17 x 12

$15,730

Historical service contract

Separate tub and shower, a long vanity, updated lighting and finishes brought the master bath together.

Second full bath with double vanity and two mirrors
Tub and surround in second bath
Double vanity in second bath

Second full bath  |  10 x 6

$7,870

Revised scope after flooring was removed

A refreshed bathing space and double vanity show how a smaller scope can still feel complete.

Custom does not always mean more expensive

These were individually quoted service contracts with homeowner-supplied major finishes. Scope, existing conditions, product choices and any discounts or promotions can move a custom quote up or down. Your written proposal sets your project price.

Steeleville, IL  |  Room to grow

A genuine before and after, seen from the adjoining space and inside the bath

BEFORE  |  Original room

Before: narrow doorway and paneled adjacent pantry space

Doorway and adjacent space

Before: pedestal sink and toilet in small paneled bathroom

Pedestal sink and toilet before the remodel

AFTER  |  Finished and furnished

After: widened doorway into the expanded bathroom

Doorway after expansion

After: expanded bathroom with vanity, toilet and tub/shower

Wide finished view with the room in use

Historical project invoice  |  $20,384.22

A narrow bath grew into the adjoining pantry. The new room gained a tub/shower, a full vanity, useful storage, updated flooring and a more open feel. The expansion required framing and service changes beyond a standard fixture refresh.

A custom path made this layout possible; a standard package suits rooms that can keep their footprint.

Carbondale, IL  |  Built from a gutted start

A construction-to-finish comparison from the room entrance

When Dead Tree began, the bathroom had already been gutted. The construction photo shows the condition at the start of our build; it is not a photograph of the original finished bathroom.

Construction stage: open framing and insulation in gutted bathroom

Construction stage

Vanity and custom shelf during installation

Custom shelf and vanity plumbing during installation

Bathroom near completion with glass shower, toilet and vanity

Bathroom near completion

Glass shower with large-format wall tile

Glass shower and large-format wall tile

A different starting point

Dead Tree took over after demolition and built a new bathing space, finished surfaces and a working bathroom. The historical bathroom-and-expansion scope totaled $16,934. A later, separate project also updated the adjoining bedroom and bath finishes.

Photo labels identify the stage shown. Historical price is for reference only.

Makanda, IL  |  A project taken over midstream

Two bathing spaces, each shown as received and after completion

Demolition had already begun when Dead Tree took over. The full bath photo shows the stripped room and unfinished floor. The master shower photo shows the dirty pan and unfinished wall board left for us to correct.

Finished full bath with tub, sliding glass, vanity and marble-look floor

Finished full bath

Wide room view: bath, vanity, floor and overall layout.

Full bath as received: stripped room and exposed framing

As received | Full bath

Stripped room, exposed framing and unfinished floor

Finished master shower with black-trim glass enclosure and marble-look wall panels

Finished master shower

Glass enclosure, shower base and large-format wall finish.

Shower as received: dirty pan and incomplete wall board

As received | Shower

Dirty pan and incomplete wall board left by others

Historical paid invoice  |  $23,171.37

The job began as labor-only work. Later, Dead Tree purchased replacement items the homeowner needed us to source. This is the actual combined invoice for that particular custom scope, not a standard package price. Your quote reflects your room, selections and any needed repairs.

05 / Clear answers

Questions before you begin

The written proposal makes the selections, scope and price specific to your room.

Is a whole-room package price labor only?

No. It is an installed scope.

A standard package starting price includes listed installation work, approved product selections and normal installation materials. The final proposal states the exact scope.

Can I choose something outside the catalog?

Yes. Comparable substitutions and upgrade options are available. See More choices beyond the catalog.

What happens if hidden damage is found?

We document concealed damage, explain the repair and price work outside the agreed scope before proceeding.

Is the written proposal my final price?

It establishes the approved scope and price. Approved changes and concealed work outside that scope are priced separately.

What warranty do I receive?

The final agreement provides a 90-day workmanship warranty. Qualifying products carry manufacturer warranties.

Do I have to shop for everything?

No. Dead Tree can purchase approved catalog selections or substitutes, or you may supply an approved upgrade.

How long does a full bath take?

A standard remodel is generally planned for about 9–15 business days after construction begins. Your proposal sets the schedule.

What about permits and inspections?

We identify requirements and state coordination, fees or exclusions in the written proposal.

Payments and approval

The proposal shows payments and timing. Optional financing is explained below.

06 / Payment choices

Project price first.

Then decide whether financing fits your plans.

Full-Bath Remodel starts at

$15,995

For package-eligible scope; your written proposal sets the project price.

How financing works

  1. 01Financing is optional; the $15,995 package price does not depend on financing.
  2. 02Scan or tap to see potential plans, rates and terms from participating lenders.
  3. 03Prequalification is not approval or a promise of any rate, limit or payment.
  4. 04Dead Tree sets your remodel scope and price; lenders decide credit terms.

GreenSky prequalification

Scan below to check possible loan options.

Tap the button below to check possible loan options.

Prequalification uses a soft credit inquiry and does not affect your credit score.

If you accept an offer and apply for a loan, a hard inquiry may affect your score.

QR code for GreenSky prequalification

Scan to check your options

Scan or tap for a secure GreenSky prequalification request. Completing prequalification does not guarantee loan approval; full offers and required disclosures appear in the GreenSky process.

Check my options

07 / From idea to build

What the price assumes

A clear scope makes the remodel easier to plan.

Standard package conditions

  • Typical residential bath with ordinary access and construction.
  • One toilet and one vanity in a substantially unchanged layout.
  • One approved prefab bathing system for a Full-Bath Remodel.
  • No major structural work or large footprint expansion.
  • No significant concealed rot, water damage, mold or extensive subfloor failure.
  • Existing electrical and plumbing adapt within normal package limits.
  • Selected products are approved catalog items or approved substitutions and are available.

When scope or price may change

  • Concealed damage or extensive subfloor repair.
  • Unusually heavy demolition or unexpected substrate conditions.
  • Out-of-code plumbing or electrical work beyond package allowance.
  • Fixture relocation, wall changes or footprint expansion.
  • Custom tile or custom glass, curbless systems, separate tub and shower or specialty features.
  • Outside-catalog products that change cost or installation.

How it works

  1. 1Site visitMeasure and verify the room.
  2. 2Package pathConfirm Standard or Custom.
  3. 3SelectChoose catalog items or approved substitutions.
  4. 4ProposalReceive written scope, price and payment options.
  5. 5ScheduleApprove, order products and schedule construction.

Ready to start?

Southern Illinois service area. Ask about a Half-Bath, Full-Bath or Custom consultation.

Final scope, selections, schedule, pricing, payments and warranty follow the written estimate or contract.